Building
CEI 3
Slider

Description

The technological flagship of the CIS, inaugurated in 2011, CEI3 has a total surface area of 5,900 sq m, mainly devoted to research and development activities related to new technologies. The primary purpose of the CEI3 is to meet a changing need by the industrial or administrative activity of the company. The design and organization of CEI3 offers great flexibility, which can be adapted to the growth of the company.

 

Built according to the most recent energy standards, CEI3 is at the cutting edge of technology in terms of surface enhancement. A simple and uncluttered volumetry of the building highlights the entrance and delivery areas. The integration of this building is in perfect harmony with the required plot development within the park. The building's surroundings are devoted to parking areas and structured circulation of heavy or light vehicles. Pedestrian access is also treated in a safe manner.

 

The building is constructed in accordance with the MINERGIE® standards and offers optimum user comfort through the services, energy connections, light and architectural quality of the structure.

 

Key info

YPC-icon_annee-de-construction

2011

Years of construction
YPC-icon_surface-locative

5’900 sqm

Total rental surface
YPC-icon_nombre-etage

Ground floor + 3 floors

Number of floors
YPC-icon_systeme-ventilation

Existing

Ventilation system

Name of the owner
Etablissement Cantonal d'Assurances (ECA)

Contact person
P+P Project Solutions SA
Cynthia Cavin
cynthia.cavin@ppproject.eu

Prices & details of the surfaces

FloorTypeAvailable areasHeightFloor loading kg/sqmPrice sqm/yearAvailability
1st floorOffices or workshops600 sqm3.5500CHF 317.- charges included (except electricity), in standard furnishingsNow
2nd floorOffices or workshopsde 30 à 850 m23.5500CHF 317.- charges included (except electricity), in standard furnishingsNow

Photo gallery