Copernic, Building A, 2021

Year of construction

sqm

Total lettable area

Number of floors

(+ Ground floor)

Ventilation system

Description

Building A, over 160 m long and set alongside the railroad tracks, offers maximum visibility and accessibility.

Thanks to their infrastructure, the ground and second floors are designed to accommodate industrial, craft and production activities. The two upper floors, built around a central street bathed in natural light, are ideal for light industry, laboratories or offices. The high degree of modularity of the floor space means that it can be adapted to suit your company’s needs.

The building’s three entrances offer direct access to the different areas, while taking advantage of shared community spaces. Tenants also benefit from a private landscaped park.

Logistical access to 4 T goods elevators via a loading bay or from ground level.

The building is in the immediate vicinity of the future SBB station.

Discover this building on video

Floors Type Available surfaces Height Ground load Price sqm/year Availability Comments
2nd floor Office
Workshop
de 80 à 2495 sqm 4,10 m 850 kg/sqm CHF 195.- 6-8 months according to layout Unfinished premises: 195/m2/year HC/HT, excluding fittings Semi-finished premises 220/m2/year HC/HT, Finished premises (fittings with standard finishes): 245/m2/year HC/HT
2nd floor Office
de 40 à 117 sqm 3.46 m 600 kg/sqm CHF 245.- Right now Serviced premises with changing rooms and cafeteria
3rd floor Office
Workshop
de 80 à 2250 sqm 4,10 m 600 kg/sqm CHF 195.- 6-8 months according to layout Unfinished premises: 195/m2/year HC/HT, excluding fittings Semi-finished premises 220/m2/year HC/HT, Finished premises (fittings with standard finishes): 245/m2/year HC/HT

Write to us or request eligibility

    Y-PARC Swiss Technopole is dedicated to hosting technological activities in Research & Development, industrial production, and training that complement the ecosystem.

    Each application for establishment is reviewed by an eligibility commission, which ensures that the proposed on-site activities meet the criteria of the Plan Partiel d’Affectation (PPA).

    To verify your eligibility, we invite you to contact us or submit your application by completing the form available below directly. You will receive a response within 30 working days.